Close-up of completed demolition permit application form

Before any walls come down, you need to know the requirements for demolition permit in your area. This essential step in the residential demolition process ensures safety, legal compliance, and avoids costly delays.

At Mayas Painting and Demolitions, we help homeowners handle permits the right way so that every project starts smoothly and finishes on time.

Why Permits Matter in Residential Demolition

Legal and Safety Protections

Demolition permits aren’t just red tape—they’re in place to protect your property, neighbors, and local infrastructure. Permits ensure your project meets building codes, environmental standards, and safety protocols.

Failing to secure one can lead to fines or legal issues, and even halt your entire project mid-way.

When You Need a Demolition Permit

Most cities require a permit for any structure removal, including:

  • Full house teardowns
  • Partial wall removal
  • Garage or shed demolition
  • Interior structural changes

Even if you’re just removing a portion of the house, it likely qualifies as structural work that requires approval.

The Demolition Permit Process Step by Step

Step 1: Submit an Application

The first step is submitting a permit application to your local building or planning department. This often includes site plans, a project outline, and contractor information. You may also need to show proof of utility shut-off and waste disposal plans.

If you’re unsure where to start, our team at Mayas Painting and Demolitions can prepare and submit all required documents for you.

Step 2: Schedule Inspections

Many cities require a pre-demolition inspection, especially if the home was built before the 1980s. Inspectors may look for asbestos, lead paint, or structural issues. You can only begin demolition after passing this step.

Getting this right early on helps avoid surprises down the road.

What Documents Are Typically Required?

  • Completed demolition permit application
  • Site or architectural drawings
  • Proof of utility disconnections (gas, electric, water)
  • Hazardous materials report (if applicable)
  • Contractor license and insurance documents
  • Waste management or hauling plan

Requirements can vary by city, but most follow a similar pattern. You can review your local code or ask us to handle it for you.

FAQs – Requirements for Demolition Permit

How long does it take to get a demolition permit?

Permit approval can take anywhere from 3 to 15 business days depending on your location and the complexity of the project.

Can I apply for the permit myself?

Homeowners can apply, but if you’re hiring a licensed demolition contractor, it’s best to let them handle it. We manage the process from start to finish.

What happens if I skip the permit?

Demolishing without a permit can result in fines, legal action, or work stoppage. You may also be forced to reverse any unapproved work.

Need Help With the Permit Process?

Don’t let permit confusion slow your project down. At Mayas Painting and Demolitions, we take care of all the residential demolition process paperwork, so you don’t have to. From small teardowns to full demolitions, we’re here to keep your project legal, safe, and on schedule.